End-to-End Project Collaboration & Problem Solving

Seamless coordination from planning to completion—built on communication.

Why Collaboration Matters

Infrastructure projects demand cross-functional expertise and dependable communication. K&H leads projects from permitting through completion with an agile, problem-solving mindset.

Hand Drilling

01

Clear communication between clients, crews, and agencies

02

Proven ability to keep complex schedules on track

03

Rapid response to site challenges and change orders

Our Core Strengths

With safety at the center of what we do, K&H has years and depth of experience. This allows us to work through projects with precision and partnership.

Doc-Collab-5

Permitting Expertise

Relationships with local and state agencies

Doc-Collab-6

Regulatory Compliance

Environmental Compliance Without Compromise

Doc-Collab-1

Scheduling & Coordination

Multi-vendor and cross-crew management

image002

Change Management

Flexible approach to evolving field conditions

Doc-Collab-8

Client Communication

Transparent reporting and documentation

Doc-Collab-9

Problem-Solving Mindset

Creative solutions under pressure

Proof

Featured Case Studies

Case Study in Collaboration

Lancaster Ohio site

The Project: AEP Shelter Replacement Project

The challenge & K&H's Role: K&H was part of a multi-year shelter replacement project for American Electric Power that spanned numerous jobsites in several locations. Each site had its own unique nuances and challenges. Specifically, at the Lancaster site:

  • K&H set up a temporary shelter so no communication was lost during the replacement.
  • K&H was charged with setting a 70K lb shelter with a 300K lb crane on a road that wasn’t even wide enough for the crane.
  • Power had to be cut during the shelter set, as there were numerous power lines that the crane was adjacent to during the shelter set. But, the power being out had to be perfectly coordinated to not hinder business for the local restaurant owner.
  • The set had to be planned for a lower traffic time, because road closures were a part of the execution and safety plan.

The result: K&H successfully coordinated and managed a detailed shelter set and rigging plan – managing subcontractors, customers, local business owners, and the general public. K&H’s involvement in the project ensured it was completed safely, on time, and with minimal disruption to the community. K&H also earned the trust and respect of the customer who commented:

The recent building off-load at Lancaster Tower Site was a very impressive off-load: height to clear communications lines, 270-ton crane, counterweights, etc. Kudos on the execution of this building off-load, especially the level of planning (Lift plan, distribution outage, restaurant coordination, tight space with existing towers, buildings) that went into this!  Please pass my Kudos to all involved – job well done!

Why Choose K&H

01.

One team from bid to build

02.

Strong agency relationships and responsive management

03.

Reputation for solving problems others can’t