Our Services:

Site Development & Civil Preparation

Full-scope site readiness for telecom, utility, and infrastructure projects.

Why it Matters

A successful project starts with the ground itself. K&H delivers grading, access, and foundation preparation services that set the stage for long-term performance.

Doc - Site Dev 2

01

Mitigate erosion and drainage issues

02

Optimize access and logistics before buildout

03

Integrate seamlessly with HDD, tower, or electrical teams

Our Core Capabilities

Full-scope civil site work supporting infrastructure and vertical construction.

Doc - Kimmel 2

Clearing & Grading

Leveling for pads and access roads

Doc-Site-Dev-10

Excavation

Power, fiber, conduit, and foundation prep

Doc-Site-Dev-11

Demolition

Tear down and removal

Doc-Site-Dev-12

Backfill / Compaction

replace and compact to required density

Doc-Site-Dev-13

Arch Culvert & Culvert Pipes

Installs pipe or conduit under concrete pads

Doc-Site-Dev-14

Landscaping

Final Grading And Restoration

Our Process Site Survey – Topography, drainage, and soil mapping

Responsive, detailed, and on a timeline that meets your needs

01

Grading & Erosion Control

Compliance with state environmental standards

02

Utility Coordination

Conduit and sleeve integration

03

Concrete Prep

Forming and subgrade compaction

04

Inspection & Turnover

Final survey and pad certification

Proof

Case Studies

Case Study in Site Development

Kimmel Civil Work

The Project: Kimmel Civil Work

The challenge: The municipality changed the entire layout of the site, because the road was at the crest of a hill. When this was changed, the road was made longer and retention ponds, swales, and additional sitework was needed.

K&H’s role: K&H did all civil work and tower construction on this site, including foundation, tower, civil prep and site work.

The result: K&H completed the project on time, even with all the challenges from the revised schedule.

Why Choose K&H

Responsive, detailed, and on a timeline that meets your needs from initial survey to project completion.

01.

End-to-end project readiness

02.

Environmental and safety compliance

03.

Local partnerships with utility providers

FAQs

Doc - Site Dev 9
Scroll to Top