Why Collaboration Matters
Infrastructure projects demand cross-functional expertise and dependable communication. K&H leads projects from permitting through completion with an agile, problem-solving mindset.
01
Clear communication between clients, crews, and agencies
02
Proven ability to keep complex schedules on track
03
Rapid response to site challenges and change orders
Our Core Strengths
With safety at the center of what we do, K&H has years and depth of experience. This allows us to work through projects with precision and partnership.
Permitting Expertise
Relationships with local and state agencies
Regulatory Compliance
Environmental Compliance Without Compromise
Scheduling & Coordination
Multi-vendor and cross-crew management
Change Management
Flexible approach to evolving field conditions
Client Communication
Transparent reporting and documentation
Problem-Solving Mindset
Creative solutions under pressure
Proof
Featured Case Studies
Case Study in Collaboration
Lancaster Ohio site
The Project: AEP Shelter Replacement Project
The challenge & K&H's Role: K&H was part of a multi-year shelter replacement project for American Electric Power that spanned numerous jobsites in several locations. Each site had its own unique nuances and challenges. Specifically, at the Lancaster site:
- K&H set up a temporary shelter so no communication was lost during the replacement.
- K&H was charged with setting a 70K lb shelter with a 300K lb crane on a road that wasn’t even wide enough for the crane.
- Power had to be cut during the shelter set, as there were numerous power lines that the crane was adjacent to during the shelter set. But, the power being out had to be perfectly coordinated to not hinder business for the local restaurant owner.
- The set had to be planned for a lower traffic time, because road closures were a part of the execution and safety plan.
The result: K&H successfully coordinated and managed a detailed shelter set and rigging plan – managing subcontractors, customers, local business owners, and the general public. K&H’s involvement in the project ensured it was completed safely, on time, and with minimal disruption to the community. K&H also earned the trust and respect of the customer who commented:
The recent building off-load at Lancaster Tower Site was a very impressive off-load: height to clear communications lines, 270-ton crane, counterweights, etc. Kudos on the execution of this building off-load, especially the level of planning (Lift plan, distribution outage, restaurant coordination, tight space with existing towers, buildings) that went into this! Please pass my Kudos to all involved – job well done!
Why Choose K&H
01.
One team from bid to build
02.
Strong agency relationships and responsive management
03.
Reputation for solving problems others can’t